Construction QA/QC Checklist: Checks and Evidence for Every Stage and Trade

A copy-ready construction QA/QC checklist by stage and trade, from pre-construction to handover, with acceptance criteria and the evidence to record.

Kush Agarwal

Kush Agarwal · President and CEO, YelloSKYE

10 min read

Close-up of an open steel stud wall at first fix under work lights, two electrical back boxes and clipped cable runs in view, with a thin yellow line joining the tops of the boxes before the wall is boarded

Key takeaways

  • The Question: What should a construction QA/QC checklist contain at each stage of a building project, and what proof should each check leave behind?
  • The Answer: A usable checklist is organised by stage and by trade, and every line states the pass condition, who inspects and which evidence gets filed. The tables below cover pre-construction, substructure, frame, envelope, MEP, finishes and handover, plus a quick card for each key trade.
  • The YelloSKYE Angle: Construct IQ supplies much of that evidence: dated drone, 360°, fixed-camera and laser-scan captures in the DEX platform, with issues tagged directly on the site visual.

A construction QA/QC checklist is a list of the checks each element must pass before work moves on, with the acceptance condition for each check and the evidence to keep. The version below is organised by build stage and then by trade, so you can copy the relevant tables into your own inspection test plan and adjust tolerances to your specification. Every line names the proof to record, because a tick with nothing behind it is hard to defend later.

This page is the checklist itself. For why inspection points sit where they do and how hold and witness points work, read our guide to construction quality control. Much of the evidence listed here can come from routine site capture through Construct IQ, YelloSKYE's construction monitoring solution.

How to read the tables

Each stage table has four columns: the check, the condition that counts as a pass, the inspection type, and the evidence to file. Tolerances are written as "as specified" on purpose: use the figures in your own specification and standards, not generic ones.

Inspection type

CodeMeaning on this checklist
SSelf-check by the trade, recorded before calling the main contractor
WWitness: inspector notified and may attend
HHold: work stops until a named person releases it
RReview of records, on site or from the office

Evidence codes

CodeWhat to file
PDated photos: one wide shot that shows where you are, one close-up of the detail
360A 360° walk of the area along the project's standard capture route
LSLaser scan, registered and compared with the design model
DRDrone capture: orthomosaic, elevation imagery or survey data
MMeasurement record: levels, dimensions, readings, with the instrument used
TTest result or certificate, referenced to the exact element or system
SIGName, role and date of the person who accepted the work

Every completed check should also carry a short header: location (level, zone, gridline or room), drawing and specification revision, trade, inspector and date. Our guide to construction site inspections explains each of these fields in more detail.

Stage 1: Pre-construction set-up

These are quality assurance checks. Nothing is built yet, but most later failures trace back to a gap here.

CheckPass whenTypeEvidence
Quality plan issuedEvery stage has a named inspector and a deputyRSigned plan, distribution list
ITP for each trade packageEvery covering activity has a check directly before itRITP register with revision
Drawing controlSite sets match the current revision registerRDated register extract
Material submittalsApproved before ordering; samples stored on siteHApproval record, P of samples
Mock-ups and benchmark areasStandard agreed by designer and ownerHP and 360 of the mock-up, SIG
Existing conditionsSite, neighbouring buildings and services recordedRDR, P
Survey controlControl points set out and independently checkedWM, coordinate listing
Capture planRoute, frequency and who captures are agreedRCapture schedule

Stage 2: Substructure

Almost everything here is buried within days, so most checks are hold points.

CheckPass whenTypeEvidence
Formation level and bearingLevels and ground as designed, base not softened by waterHM, DR or P, geotechnical sign-off
PilesPosition, depth and integrity as specifiedHPile log, T, as-built positions (M)
Below-ground drainageFalls, bedding and joints correct; test passedHT, P, M
Waterproofing or tankingLaps continuous; corners and penetrations detailed; no damageHP per detail, 360 of each wall
Foundation reinforcementBar sizes, spacing, cover, laps and starter bars as drawnHP, M, SIG on pour release
Ground slab preparationMembrane, insulation and service stubs in positionH360 or P, M
BackfillApproved material placed and compacted in layersWT (compaction), P

Stage 3: Frame

The pour is the big covering event. Record the deck fully before concrete arrives.

CheckPass whenTypeEvidence
FormworkLine, level, plumb, stable and cleanS, WM, P
ReinforcementMatches drawings; spacers give the specified coverHP, 360 or LS before the pour
Cast-in itemsSleeves, embeds, anchor bolts and conduits match the coordinated modelHLS or 360, M
Concrete deliveryApproved mix confirmed, samples takenWDelivery tickets, T
Curing and strikingMethod and striking times as specifiedSCuring log
Post-pour surveySlab levels, column positions and openings within toleranceRLS, M
Structural steelConnections complete, bolts marked as tightened, alignment checkedHP, M, T
MasonryWall ties, movement joints and lintels in placeWP

Where tolerances are tight, a scan beats a tape. On YelloSKYE's as-built versus BIM clash detection work, a terrestrial laser scan taken after a structural stage is overlaid on the design model in Revit or Navisworks, so a misplaced column or missing sleeve is found before follow-on trades start.

Stage 4: Envelope

CheckPass whenTypeEvidence
Brackets and fixingsType, spacing and embedment as designedHP per bay, T (pull-out tests)
Air and vapour control layersContinuous, taped and sealed at every junctionHP, 360
Cavity barriers and insulationPositioned as drawn, no gapsHP per elevation zone
Windows and doorsInstalled, packed and sealed; drainage path clearWP, T (water test)
CladdingPanel alignment, joint widths and fixings as specifiedS, RDR elevation capture, M
RoofingSubstrate, falls, laps, upstands and outlets correctHDR, P, T (leak test)
SealantsCorrect product on prepared jointsSP

Elevations are slow to check from the ground. A facade inspection from a desk uses a dated high-resolution map of each elevation in DEX, with the elevation drawing laid over it, so reviewers can measure and mark issues before deciding what needs a close-up visit.

Stage 5: MEP installation

CheckPass whenTypeEvidence
Routing and clearancesServices follow the coordinated modelW360, LS
Supports and bracketsType and spacing as specifiedSP
Electrical first fixContainment, back boxes and cables positioned and segregatedS, W360 before boarding
Pipework pressure testsTest held for the specified duration with no lossHT referenced to system and zone
Ductwork leakage testsWithin the specified limitHT
Insulation and labellingComplete and readableSP
Fire stopping at penetrationsApproved system, complete, labelledHP of each penetration, register
CommissioningSystems perform to the designWT (commissioning sheets)

Stage 6: Finishes and fit-out

CheckPass whenTypeEvidence
Partitions before closingServices tested, backing for fixtures and acoustic insulation in placeH360 of each room
Board and joint finishFlatness and joints as specifiedSP
ScreedLevel, thickness and moisture content suitable for the floor finishWM, T
Wet areasWaterproofing complete and tested before tilingHP, T (flood test)
CeilingsGrid level; access panels where the services need themS, W360
Joinery and fittingsSecurely fixed and operatingSP
DecorationMatches the approved sampleSP beside the mock-up record
ProtectionFinished work protected from following tradesSP

On YelloSKYE's interior fit-out projects, 360° walks are captured by ordinary site staff with no specialist technician, and each image is mapped to its place on the floor plan. Teams reported 70% less coordination time and snags closing five times faster.

Stage 7: Handover

CheckPass whenTypeEvidence
Contractor's own zone inspectionEvery zone walked and defects recordedR360 per zone
Punch itemsEach item closed against a photo of the fixRP before and after, SIG
Test and commissioning fileEvery system has its certificatesRT index
Manuals and warrantiesComplete for every installed productRDocument register
As-built informationDrawings or model updated to what was builtRLS, M
Visual recordOwner and operator have access to the full capture historyRAccess confirmation
Defects period planReporting route and response times agreedRSIG

How to run the closeout list itself is covered in our construction punch list guide. On the warehouse operator handover use case, the operator was given role-based access to the full visual history in DEX at completion, and there were no documentation disputes after handover.

Trade cards

Stage tables follow the building. Trades work across several stages, so give each trade its own short card. Pin these into the subcontract package and ask for the evidence column at every hand-over between trades.

TradeBefore startingBefore work is coveredEvidence the trade hands over
ConcreteFormwork accepted; mix approved; pour plan agreedReinforcement, cover and cast-ins released (H)Pour release, delivery tickets, cube or sample results
Structural steelFoundation bolts surveyed; erection sequence agreedConnections inspected before fire protectionBolt check record, weld tests, P of connections
Waterproofing and roofingSubstrate dry, clean and acceptedEvery lap, corner and penetration inspected (H)P per detail, leak or flood test
ElectricalRoutes coordinated; containment drawings currentFirst fix recorded before boarding360 of each room, test schedules
Mechanical and plumbingRoutes coordinated; supports agreedPressure or leakage test passed (H)T per system and zone, 360
Fire stoppingApproved systems listed for each penetration typeEvery penetration sealed and labelled (H)P and register entry per penetration
Drylining and ceilingsServices above and behind signed offRoom recorded before boards go on (H)360 of each room, P of backing
FinishesSubstrate accepted; samples approvedNot applicable: inspect on completionP against mock-up, snag list

What counts as good evidence

The evidence column is only useful if someone can find and trust it later. Apply these rules to every type.

EvidenceGood enough when
PhotoThe wide shot shows a gridline, door or other fixed reference; the close-up includes a tape or scale where size matters
360° walkTaken on the same route each time and placed on the floor plan, so two dates can be compared
Laser scanRegistered to project coordinates and compared with the model, with the deviations reported
Drone captureDated, covering the whole area being checked, and comparable with the previous flight
Test certificateNames the system, the zone and the test standard, and is filed with the check it supports
MeasurementStates the instrument, the reading and the specified tolerance

Where an issue is found, raise it on the record rather than in a message. Construct IQ uses geo-referenced annotations, so a non-conformance is tagged directly on the site visual and the contractor sees exactly where and what needs fixing. DEX also lets reviewers scroll back through the site history day by day, which helps when a fix needs to be compared with the original condition.

Non-conformance log: the columns to keep

ColumnExample entry
ReferenceNCR-L3-014
LocationLevel 3, gridline C/4, riser cupboard
Check it failedFire stopping at penetrations
DescriptionTwo cable trays unsealed through the compartment wall
EvidenceP (wide and close), 360 capture of the riser
Owner and due dateFire stopping contractor, before ceiling closure
Corrective actionSeal with approved system and label
Closure evidenceP from the same position, SIG of verifier
Root cause notedTrade briefing missed cable tray detail

The last column is where QC feeds QA. If the same root cause appears on several floors, change the method or the briefing, not just the defect.

Adapting this checklist to your project

  1. Copy the stage tables that apply. A fit-out job may only need Stages 1, 5, 6 and 7.
  2. Replace "as specified" with real numbers. Pull tolerances, test durations and limits from your specification.
  3. Check the inspection types against your quality plan. Add hold points wherever your contract or authority requires attendance.
  4. Name people, not roles. Each H line needs a person who can release it the same day.
  5. Match the evidence to your capture routine. Time 360° walks and scans to the covering events, not to a fixed weekday.
  6. Issue the trade cards with the subcontracts. Trades should know what evidence they owe before they mobilise.
  7. Review the non-conformance log weekly and update the checklist when a fault repeats.

Frequently asked questions

What should a construction QA/QC checklist include?

Each line should name the check, the condition that counts as a pass, the type of inspection (self-check, witness or hold) and the evidence to file. The header should record the location, the drawing revision, the inspector and the date. Without the acceptance condition and the evidence, a ticked box proves very little.

How do I create a QA/QC checklist for my project?

Start from the specification and the inspection test plan for each trade package, then list every activity that will hide or lock in earlier work and put a check immediately before it. Use a generic stage checklist, like the one in this guide, as a starting point and add the project's own tolerances, tests and approvals. Review it with each trade before they start.

What evidence should be recorded for a QA/QC check?

Record at least a dated photo showing where the element is and a close-up showing the detail being checked. Add measurements, test certificates or a scan where the check depends on a number. Before a covering activity, a full 360° walk or scan of the area is worth keeping because it shows conditions nobody thought to photograph.

Should subcontractors fill in their own QA/QC checklists?

Yes. Each trade should self-check its work against the checklist and attach evidence before asking the main contractor to inspect. The main contractor then verifies, and hold points are released by the person named in the quality plan. Self-checking catches most faults early and shortens the formal inspection.

Is a paper QA/QC checklist good enough?

Paper can work on a small job, but it is hard to search, easy to lose and rarely linked to photos or locations. A digital checklist that stores the evidence with each line, pinned to a place on the drawing, is far easier to audit later and to share with the owner and designers.

Put this into practice

Eliminate blind spots with Construct IQ.

Keep reading

All guides
Construct IQSee it on your siteBook a demo
Book Your Free Demo

Ready to gain
absolute clarity?

Request a custom walkthrough of your site and see how YelloSKYE delivers boardroom-ready answers.

  • 15-Minute Walkthrough
  • Zero Commitment
  • Custom Strategy

Providing intelligence to intelligent leaders

Larsen & Toubro
Amazon
TATA Projects
Adani Enterprise
DLF Limited
Google
Godrej
Lodha
HDFC
Kirloskar
Toyota Kirloskar
Mahindra
Larsen & Toubro
Amazon
TATA Projects
Adani Enterprise
DLF Limited
Google
Godrej
Lodha
HDFC
Kirloskar
Toyota Kirloskar
Mahindra