Construction Progress Billing: Schedules of Values, Retention and Verified Claims

How construction progress billing works: the schedule of values, percentage vs measured claims, retention, verifying installed work and the disputes to avoid.

Kush Agarwal

Kush Agarwal · President and CEO, YelloSKYE

9 min read

Office corridor during fit-out in overcast daylight, with ceiling tiles fitted along the near half and an open ceiling grid beyond, the finished section outlined in thin yellow

Key takeaways

  • The Question: How does progress billing work on a construction project, and how can owners and contractors agree each payment claim quickly and fairly?
  • The Answer: The contract sum is split into a schedule of values, and each period the contractor claims the value completed against each line, less earlier payments and retention. Claims are approved fastest when each line is small enough to check, measured where possible, and supported by dated site evidence that both sides review before the assessment.
  • The YelloSKYE Angle: Construct IQ times drone flights, 360° walks and fixed-camera records to the claim cut-off, so the owner's team and the contractor check the same measured, dated record of installed work.

Progress billing is how most construction contracts are paid: the contractor invoices in stages, usually monthly, for the value of work completed in that period, and the owner pays after checking the claim. Depending on the country and contract, the same document is called a progress payment claim, a payment application, a pay application or an interim valuation, but the mechanics are the same.

Getting it right matters to both sides. The contractor needs cash to pay subcontractors and suppliers, and the owner needs to avoid paying for work that is not there. This guide explains how the billing cycle runs, how to build a schedule of values that can be verified, how percentage claims differ from measured ones, how retention works and how evidence from Construct IQ shortens the approval.

How a progress billing cycle runs

Payment terms and deadlines are set by the contract and, in many countries, by legislation on construction payments. In the US many projects use the AIA G702 and G703 forms; in the UK the Construction Act sets requirements for payment and pay less notices. Those are examples only: check the rules where your project is built. The sequence underneath is broadly similar everywhere.

  1. Cut-off. The claim covers work completed up to an agreed date each period.
  2. Claim. The contractor states the value complete against each line of the schedule of values, adds approved changes and eligible materials, and deducts retention and earlier payments.
  3. Assessment. The owner's representative, cost consultant or architect checks the claim against the site and the contract, and may adjust lines.
  4. Certificate or notice. The assessed amount is confirmed in writing, with reasons for any reduction.
  5. Payment. The owner pays within the contractual period, and the main contractor pays its subcontractors through the same chain.

Every link in that chain depends on the one below it. A subcontractor's overstated claim becomes part of the main contractor's claim, so weak checking at one level passes the error upwards.

The schedule of values: build it so it can be checked

The schedule of values divides the contract sum into lines with agreed values. It is drawn up at the start of the contract and usually cannot be changed without agreement, so its structure decides how hard every later claim will be to assess.

Line item (illustrative)ValueMeasure of progressHow it can be checked
Bulk excavation and fill6%Cubic metres movedDrone survey volumes against the design surface
Foundations and ground slab9%Bases and slab areas completeAerial capture, pour records
Frame, levels 1–618%Floors completeDrone capture by level, pour records
Facade, north and east elevations8%Square metres installedAerial capture, elevation images
Mechanical first fix, levels 1–37%Areas complete360° capture of each floor before ceilings close
Internal finishes, levels 1–36%Rooms complete360° capture, inspection sign-off
Preliminaries12%Time elapsedProgramme

Values are shown as shares of the contract sum for illustration only.

Three principles make a schedule of values easier to verify:

  • Split by location as well as by trade. "Mechanical installation" as one line invites argument; "mechanical first fix, levels 1 to 3" can be checked floor by floor.
  • Choose a measure for each line at the start. Agree whether it will be claimed by quantity, by milestone or by percentage, and what counts as complete.
  • Keep values balanced. If early lines are priced high, the contractor is paid ahead of the work. Front-loading and other reasons claimed progress drifts from the site are explained in our guide to percent complete.

Percentage claims versus measured quantities

There are four common ways to value a line in a claim. Most contracts mix them.

MethodHow the claim is valuedWorks well forWeakness
Percentage completeThe contractor states a percentage of each lineLines with no natural unit, such as design or commissioningSubjective, and hard to challenge without evidence
Measured quantitiesInstalled quantity multiplied by an agreed rateEarthworks, concrete, facade, linear servicesRequires reliable measurement at each cut-off
MilestonesFixed sums paid when defined events are reachedRepetitive or clearly staged workDisputes about whether a milestone is truly met
Cost-reimbursableActual cost plus an agreed feeUncertain scope, early worksNeeds strong cost records and audit

Measured quantities are the most objective because they can be repeated by anyone with the same data. For earthworks in particular, comparing successive drone surveys gives cut and fill volumes directly; YelloSKYE's volume measurements are within 1–3 per cent of traditional survey methods. Our earthwork volumetrics use case shows how this takes the argument out of quantity claims on groundworks.

Where a percentage is unavoidable, tie it to observable steps. "Ductwork installed and hung, not yet tested" is a step anyone can confirm from a 360° image; "60 per cent done" is not.

Retention

Retention is a share of each payment that the owner keeps back as security for completing the work and fixing defects. It is often between 5 and 10 per cent, sometimes reducing once a set value of work is done, with part released at completion and the balance at the end of the defects period. The rate, any cap and the release terms are set by the contract, and several countries regulate retention, for example by limiting it or requiring it to be held separately.

For the contractor, retention is cash earned but not received, and on a thin-margin job it can exceed the profit. Two practical points help both sides:

  • Track retention by subcontract and by release date so that releases are claimed on time rather than forgotten.
  • Record the condition of work at completion. A dated capture of each area at handover makes it much easier to agree which defects existed then and which appeared later, and so to release retention on schedule.

Materials, changes and the other items in a claim

Materials on and off site

Many contracts allow payment for materials delivered but not yet installed, and sometimes for materials stored off site. The owner normally needs proof of quantity, ownership and protection. A dated image of the stored materials, with delivery records, is the simplest support.

Approved and pending changes

Only changes that have been instructed and valued in line with the contract normally belong in the claim. Pending changes should be listed separately so that the owner can see the exposure without the claim being held up by them. Mixing them is one of the most common reasons a whole claim is delayed.

Overbilling and underbilling

Contractors track the gap between what has been billed and the value of work actually done, often in a work-in-progress schedule. Overbilling means cash has arrived ahead of the work; underbilling means work has been done but not yet paid for. Neither is wrong in itself, but persistent overbilling hides problems on a job until the money runs out, and persistent underbilling strains cash. Verified progress keeps the figures honest on both sides.

Verifying installed work before approval

The assessment is where most time is lost. Owners' teams traditionally walked the site at month end with drawings and a camera, then spent days querying the contractor. A structured verification routine is faster and fairer.

  1. Capture the site at the cut-off. Schedule a drone flight, 360° walk or both in the days before the cut-off, so the record shows the same moment the claim describes.
  2. Map each claim line to evidence. For every line, note where in the capture the claimed work can be seen or measured.
  3. Measure what can be measured. Volumes, areas and lengths from survey data rather than estimates.
  4. Check concealed work before it is covered. Services in slabs, waterproofing and insulation must be recorded before the next trade closes them, or the claim can only be taken on trust.
  5. Record each adjustment with its reason and the evidence used. The contractor can then respond line by line rather than to a lump-sum reduction.
  6. Share the same record with the contractor. When both parties review the same captures, most differences are resolved before the certificate is issued.

On projects using this approach, our contractor billing disputes use case reports 80 per cent fewer site visits needed for verification.

Common billing disputes and the evidence that settles them

DisputeTypical causeEvidence that helps
Quantity claimed is too highEstimates in place of measurement, double countingSurvey-measured quantities at each cut-off
Work claimed is not completeDifferent understandings of "complete"Agreed completion definitions, 360° capture of the area
Work completed but not paidClaim reduced without explanationLine-by-line reasons with dated images
Hidden work disputed laterNo record before coveringCaptures taken before ceilings, slabs or walls close
Materials on site rejectedNo proof of quantity or protectionDated images of stored materials and delivery records
Change valued differentlyInstruction unclear, scope not recordedBefore and after captures of the changed area
Retention held too longDisagreement about defects at completionHandover captures of each area

When a disagreement cannot be settled in the assessment, the same records become the core of the dispute file. Our guide to construction dispute documentation covers how to keep them so they hold up.

How evidence shortens approval

Faster approval is not achieved by checking less. It comes from checking in a way that both sides accept the first time. Three habits make the difference:

  • Agree the evidence before the first claim. Capture cadence, viewpoints, measurement methods and completion definitions belong in the project's first month, not in the first argument.
  • Use one record for both parties. If the contractor prepares its claim from the same captures the owner uses to assess it, most lines need no discussion.
  • Keep it in one place. Construct IQ stores drone, 360° and fixed-camera captures in the DEX platform by date and location, with geo-referenced annotations so a query can point to the exact spot in question. Measurements and volumes are taken in the same place.

Checklist for a progress billing process

  1. Break the schedule of values down by location as well as trade, with a progress measure for each line.
  2. Write down what "complete" means for every line that will be claimed by percentage.
  3. Align the site capture date with the claim cut-off every period.
  4. Measure earthworks, structure and facade quantities from survey data.
  5. Record concealed work before it is covered.
  6. Keep pending changes outside the claim, listed separately.
  7. Give reasons and evidence for every adjustment in the assessment.
  8. Track retention by subcontract and release date, and capture each area at handover.

Frequently asked questions

What is progress billing in construction?

Progress billing is the practice of invoicing a construction contract in stages as the work is carried out, usually monthly, rather than in one amount at the end. Each claim states the value of work completed to date, deducts earlier payments and retention, and is checked by the owner's representative before payment. It keeps cash moving to the contractor in step with the work.

What is a schedule of values?

A schedule of values is the breakdown of the contract sum into line items, such as packages, trades, areas or milestones, each with an agreed value. Every progress claim reports the percentage or quantity complete against each line. A good schedule of values is detailed enough that each line can be checked on site.

How much retention is held on construction contracts?

Retention is often in the range of 5 to 10 per cent of each payment, with part released at completion and the rest after the defects period, but the rate, caps and release terms depend on the contract and on local law. Some countries limit retention or require it to be held in a separate account. Always check the contract and the rules where the project is built.

What is the difference between overbilling and underbilling?

Overbilling means the contractor has billed more than the value of work actually completed, so it is holding cash ahead of the work. Underbilling means the work completed is worth more than has been billed, often because claims were cut back or changes were not yet agreed. Both should be visible in a contractor's work-in-progress schedule and both distort the true position of the job.

How can owners verify a progress payment claim?

Compare each claimed line with dated evidence from the site at the claim cut-off: drone surveys for earthworks and structure, 360° captures for interiors, and inspection records for work that will be concealed. Measure quantities where possible rather than estimating them. Agreeing the evidence and the cut-off date with the contractor in advance removes most disagreements before they start.

Put this into practice

Eliminate blind spots with Construct IQ.

Keep reading

All guides
Construct IQSee it on your siteBook a demo
Book Your Free Demo

Ready to gain
absolute clarity?

Request a custom walkthrough of your site and see how YelloSKYE delivers boardroom-ready answers.

  • 15-Minute Walkthrough
  • Zero Commitment
  • Custom Strategy

Providing intelligence to intelligent leaders

Larsen & Toubro
Amazon
TATA Projects
Adani Enterprise
DLF Limited
Google
Godrej
Lodha
HDFC
Kirloskar
Toyota Kirloskar
Mahindra
Larsen & Toubro
Amazon
TATA Projects
Adani Enterprise
DLF Limited
Google
Godrej
Lodha
HDFC
Kirloskar
Toyota Kirloskar
Mahindra